Experience

Transport

Mayor Achievements Contractor

Interconnection ANW-ANE in 500 kV. Interconnection of Substations Bracho, Cobos, Monte Quemado Chaco and Resistencia

  • 2 stage studies together with other consultant colleagues.
  • Studies of Charge Flow, Short-circuit, transient stability.

Consorcios de Constructores Liderados por INTESAR

Interconnection Comahue Cuyo in 500 kV. Interconnection of Substations Agua del Cajón, Río Diamante, Gran Mendoza.

  • Stage 2 studies together with other consultant colleagues.
  • Studies of Charge Flow, Short-Circuit, Transient Stability.

Consorcios de Constructores Liderados por INTESAR.

Patagonia regional Interconnected System, including Subsystem South. Interconnection of Substations Santa Cruz Norte, Río Santa Cruz Norte, Esperanza in 500 kV and Río Turbio, Esperanza in 220 kV.

  • Stage 2 studies together with other consultant colleagues.
  • Studies of Charge Flow, Short-Circuit, Transient Stability.

Consorcios de Constructores Liderados por INTESAR.

SSistema Patagónico 500 kV – series capacitor bank line 500 kV Puerto Madryn – Choele Choel Substations.

  • Design studies for the dimensioning and location.

Mercados Energéticos Argentina

Río Turbio TPP, province of Santa Cruz (2 TV 120 MW).

  • Stage 1 studies - Connection to SADI-
  • Drawing up of the required documents to prepare the Request form of Incorporation to the Transmission System.

Unión Transitoria de Empresas Río Turbio GRUPO ISOLUX CORSAN S.A. ISOLUX, TECNA y GHESA.

Interconnection to the electric network of Guatemala, of the Interconnection line 230 kV between substations of TACTIC and ESTOR. Supply of electricity to the mining production plant of the Compañía Guatemalteca de Níquel (Sky Resources Inc.)

  • Studies of charge flow, transient stability and short-circuit.
  • Studies of harmonics in busbar Sky 230 kV and in Estor 34,5 kV.

Duke Energy

Adjustments of Protections of Subsystem SIC Sur from Chile. Final Stage with incorporation of Cautín 220 kV Substation.

  • Calculation and Analysis of short-circuit currents.
  • Simulations of stability of symmetric and asymmetric failures, in order to determine the variation of R and X for the subsequent adjustment of impedance relays in the lines.

SIEMENS S.A.

Patagonia Regional Interconnected System, including Subsystem Sur, 2nd Stage. It comprises the interconnection in 500 kV of Santa Cruz Norte, Río Santa Cruz and Esperanza Substations. The Subsystem Sur comprises the link in 220 kV of Esperanza Substation with Río Gallegos Substation and with Río Turbio Substation and Esperanza Substation with El Calafate Substation in 132 kV.

  • Technical assessment in order to define the voltage level of the interconnection.
  • Trace analysis.
  • Determination of the configuration of Substations.
  • Carrying out of project at the level of Basic Engineering.
  • Preparation of technical documents for the call for public bidding to interested parties.
  • Preparation of technical documentation for the access application and uprating.
  • Preparation of the technical documents to be included in the specifications and preparation of the specifications for the biding of the corresponding Contract of Operation and Maintenance (COM).
  • Preparation of the necessary technical documents for the biddings destined to the selection of the suppliers of structures, conductors, transformers and other provisions.

Comité de Administración del Fondo Fiduciario para el Transporte Eléctrico Federal (CAF).

Electric Interconnection HVL and CAS Río Grande – Río Milna – Ushuaia and Sub-transmission system in 33 kV in the Province of Tierra del Fuego, Antarctica and Isles of the South Atlantic.

  • Propositions about supplying alternatives.
  • Study of the different alternatives.
  • Revision and setting of the basic draft plan.
  • Presentation of the technical documents for the access application and uprating.
  • Implementation of the environmental impact study and electric study.
  • Electric studies.
  • Referential study of environmental impact.
  • Presentation of the technical documents to be included in the specifications for the bidding of the contract.
  • Description of the characteristics of present installations.
  • Engineering of the transmission line.
  • Engineering of Substations.
  • Telecontrol and Communication systems.
  • Specifications.

Dirección Provincial de Energía Eléctrica – Provincia de Tierra del Fuego.

Studies of Electric Interconnections in Extra High Voltage between the Provinces of Mendoza and San Juan. The 500 kV EHVL between Mendoza and San Juan operates, in a first stage, in 220kV. This work is part of the Federal Plan of Electricity Transmission.

  • Propositions about supplying alternatives.
  • Study of the different alternatives.
  • Revision and adjusting of the basic draft plan.
  • Presentation of the technical documents for the access application and uprating.
  • Implementation of the environmental impact study and electric study.
  • Electric studies to comply with the requirements of CAMMESA.
  • Referential study of environmental impact.
  • Presentation of the technical documents to be included in the specifications for the bidding of the COM contract.
  • Description of characteristics of present installations.
  • Engineering of the transmission line.
  • Engineering of the Substations.
  • Telecontrol and Communication systems.
  • Specifications.

Comité de Administración del Fondo Fiduciario para el Transporte Eléctrico Federal (CAF)

Analysis of supply to the mining site El Pachón, from SADI, considering different base topologies of SADI.

  • Proposal of possible topologies of SADI.
  • Structural definition of the line and its trace.
  • Cost analysis of works.
  • Analysis of responsibility of Pachón in works the the Federal Plan of Transmission.
  • Alternatives of energy purchase.
  • Economic analysis of alternatives.

XSTRATA Pachón S.A. SNC Lavalin (Chile)

Electric Studies for the Power Exportation to the Central Interconnected System of CHILE.

The purpose of this work is to determine the possible restrictions to the exportation of a maximum power of 250 MW, using a double line of 220 kV from the Hydraulic Power Plant of Alicurá to the Central Interconnected System of the Republic of Chile, in the year 2007.

AES-GENER- Chile

Electric Studies of Stage I, requested by CAMMESA for the incorporation of a second converter Back to Back (HVDC) between Argentina and Brazil in the Substation Garabí, with a capacity of 1000 MW.

  • Electric Studies of Stage II (Additional Studies) requested by Cammesa for the incorporation of the first converter Back to Back (HVDC) between Argentina and Brazil in the Substation Garabí, with a capacity of 1000 MW.

ABB Power Systems

Studies of Supply for the San José Project of Minera Santa Cruz. San José Project is a gold and silver mining project places in the province of Santa Cruz, near Paraje Huevos Verdes, 70 Km. from Perito Moreno. The studies include.

  • Proposal of supply alternatives and technical and economical assessment of each one of them in order to choose the most convenient alternative of supply, considering the maximum power required as well as the possibilities of expansion of the site.
  • Preparation of documents required for the Request of Incorporation to the transmission system of the area.
  • Preparation of the basic pre-design that allows the determination of budgets and Maintenance and Operation cost (OyM). Preparation of the chronogram of payment.
  • Development of basic engineering.
  • Specifications for bid.
  • Study of adjustments of protections

Minera Santa Cruz S.A.

Estudios Eléctricos Para La Exportación de Potencia al Sistema Interconectado Central de CHILE (SIC).

El objetivo de este trabajo es determinar las posibles restricciones a la exportación de una potencia máxima de 250 MW al Sistema Interconectado Central de la Republica de Chile (SIC) en el año 2007, a través de una línea doble terna de 220 kV desde la Central Hidráulica de Alicurá.

Se han estudiados escenarios medios que consideran una exportación máxima de 2000 MW a Brasil, además de los intercambios de potencia con Uruguay, Paraguay y con el Sistema Patagónico.

AES-GENER- Chile

Abastecimiento Eléctrico al Proyecto Gualcamayo, emprendimiento minero localizado en el Departamento Jáchal al norte de la Provincia de San Juan. El proyecto demandará una potencia máxima de 7 MW.

  • Planteo de alternativas de abastecimiento y evaluación técnica y económica de cada una de ellas con el objeto de seleccionar la alternativa de suministro más conveniente, considerando la potencia máxima requerida como así también las posibilidades de expansión del yacimiento.
  • Análisis de la Participación de Gualcamayo en otras obras de ampliación del Sistema de Distribución de La Rioja o San Juan.
  • Elaboración la documentación necesaria para confeccionar a la Solicitud de Acceso al sistema de transporte del área.
  • Elaboración del anteproyecto básico que permita efectuar una determinación de los presupuestos y costo de Operación y Mantenimiento (OyM). Elaboración de un cronograma de desembolsos.
  • Desarrollo de Ingeniería Básica.
  • Estudio ajuste de protecciones.

Minas Argentinas S.A

Medición de la onda tensión en la ET Rosario Oeste para identificar el contenido armónico de la misma ante la inserción de capacitores shunt de 135 MVAr.

ABB Power Systems

Guía de referencia del Transporte de EDESTE.

  • Guia 2004-2008.
  • Guia 2010-2014.
  • Guia 2011-2015.

EDESTE S.A.

Elaboración de la “Guía de Referencia del Sistema de Distribución de 132 kV de Energía San Juan. 1999 - 2004”.

Energía San Juan – Distribuidora de la Provincia de San Juan – Argentina

Estudios de Etapa II Conexión de Conversoras en la ET Garabí II (Exportación de 2000 MW Brasil) . Diseño del Sistema DAD / DAG NEA.

ABB Power Systems

Estudios Eléctricos de Etapa I, solicitados por CAMMESA por la incorporación de una segunda conversora Back to Back (HVDC), entre Argentina y Brasil en la ET Garabí, con una capacidad de 1000 MW.

Estudios Eléctricos de Etapa II (Estudios Adicionales) solicitados por Cammesa por la incorporación de la primera conversora Back to Back (HVDC) entre Argentina y Brasil en la ET Garabí con una capacidad de 1000 MW.

ABB Power Systems

Interconexión Eléctrica LAT LAT 132 kV San Julián – Manantial Espejo – Gobernador Gregores de la Provincia de Santa Cruz

  • Planteo de alternativas de abastecimiento.
  • Estudio de las distintas alternativas.
  • Revisión y Ajuste de Anteproyecto Básico.
  • Presentación de Documentación Técnica para Solicitud de Acceso y Ampliación.
  • Ejecución de los Estudios Eléctricos y de Impacto Ambiental.
  • Estudios eléctricos.
  • Estudio de Impacto Ambiental de Referencia.
  • Presentación de Documentación Técnica a incluir en el pliego para la Licitación del Contrato.
  • Descripción de las características de las instalaciones existentes.
  • Ingeniería de la Línea de Transmisión.
  • Ingeniería de EE.TT.
  • Sistemas de Comunicación y Telecontrol.
  • Pliegos de Licitación.

SPEE – Servicios Públicos Sociedad del Estado Provincia de Santa Cruz.

Proyecto de interconexión Río Grande - Ushuaia 220 kV.

  • Preparación de la documentación técnica a incluir en el Pliego para la Licitación de las obras.
  • Estudio de Impacto Ambiental de las Obras.
  • Preparación de la documentación técnica para la Solicitud de Acceso y Ampliación.

DPE Tierra del Fuego

Análisis de las Alternativas de Abastecimiento Eléctrico correspondiente al Proyecto Cerro Moro. Este nuevo proyecto, se encuentra ubicado en el Departamento Deseado de la provincia de Santa Cruz, a unos 76 km al sur de la localidad de Antonio de Biedma.

EXTORRE Gold Mines

Estudios de Abastecimiento para el Proyecto San José de Minera Santa Cruz. El Proyecto San José, es un proyecto minero de oro y plata ubicado en la provincia de Santa Cruz, en las cercanías del Paraje Huevos Verdes a 70 Km. de Perito Moreno. Los estudios incluyen.

  • Planteo de alternativas de abastecimiento y evaluación técnica y económica de cada una de ellas con el objeto de seleccionar la alternativa de suministro más conveniente, considerando la potencia máxima requerida como así también las posibilidades de expansión del yacimiento.
  • Elaboración la documentación necesaria para confeccionar a la Solicitud de Acceso al sistema de transporte del área.
  • Elaboración del anteproyecto básico que permita efectuar una determinación de los presupuestos y costo de Operación y Mantenimiento (OyM). Elaboración de un cronograma de desembolsos.
  • Desarrollo de Ingeniería Básica.
  • Pliegos de Licitación.
  • Estudio ajuste de protecciones.

Minera Santa Cruz S.A.